Fife Council invested £21.1 million into the new facility at Michael Woods Sports & Leisure Centre and an additional £1.5M was provided by Sport Scotland’s Sports Facilities Fund. The pools at the leisure centre provide regional training and competition facilities with a spectating gallery for 250 people.
Independent water treatment plants are provided for each of the three pools. This facilitates independent temperature control in each pool. Circulation within the training pool takes account of the movable floor.
The water treatment system incorporates PAC flocculation, medium rate filtration on sand, photo-oxidation using ultraviolet, heating, pH control and residual disinfectant control using chlorine. VSDs control pump flows linked to an electronic flow meter. Full area movable floor in training pool provides a range of water depths for different training activities.
Client:
Fife Council
Completion:
2013
Architects:
B3 & Cre8architecture
Quantity Surveyor:
Turner Townsend
Structural Engineer:
Arup
M&E Engineers:
Arup
Pool Consultant:
Devin Consulting