Skip to content
Award winning pool

Latymer Upper School, London

Share:
Latymer Upper School, London Pool Hall

Project details

A 25m competition pool with movable floor.

Project role

Design of the water treatment system and movable pool structure; site monitoring of installation and commissioning.

At Latymer Upper School, London, circulation within the training pool takes account of the movable floor.

The water treatment system incorporates PAC flocculation, medium rate filtration on sand, photo-oxidation using ultraviolet, heating, pH control and residual disinfectant control using chlorine. VSDs control pump flows linked to an electronic flow meter.  The movable floor in   training pool provides a range of water depths for different training activities.

If you would like to learn more about what we can do for your next project, please visit our Services page.

  • Client:

    Latymer Upper School, London

  • Completion:

    2016

  • Architects:

    FaulknerBrowns

  • Quantity Surveyor:

    Synergy

  • Structural Engineer:

    Elliot Wood Partnership

  • M&E Engineers:

    Hoare Lea

  • Pool Consultant:

    Devin Consulting

Project Gallery