PWTAG compliant pool water treatment system serving an 8 lane 25m competition pool with raised ends to be used by Eastbourne College for swimming training, amateur swimming competitions and for external swimming clubs. The water treatment system incorporates PAC flocculation, medium rate filtration on single grade sand beds, photo-oxidation using ultraviolet radiation, heating, pH control and residual disinfectant control using chlorine.
Client:
Eastbourne College
Completion:
2018
Project Manager:
Northgates Limited
Architects:
Miller Bourne Architects
Quantity Surveyor:
F T Allen
Structural Engineer:
Gyoury Self Partnership
M&E Engineers:
Hoare Lea
Pool Consultant:
Devin Consulting