Versatile leisure facility offering sports & wellness for the whole region

Ards Blair Mayne Wellbeing & Leisure Complex, Ireland

Share:
Ards Blair Mayne Wellbeing & Leisure Complex, Ireland Swimming Pool with Boom

Project details

This new sports complex includes a 25m pool with movable floor & boom, a minor pool (20m), children’s splash pool, and a health suite.

Project role

Design & specification of the pool water treatment systems & water features; and site monitoring of installation and commissioning. The filtration systems design contributed to the sustainability agenda through use of variable speed drives on the pumps, metering of all water and electrical supplies, efficient water distribution and step back switching of the ultra violet dosing system.

At Ards Blair Mayne Wellbeing and Leisure Complex we designed the specialist engineering for the wet facilities in the Aqua Zone which includes a six-lane 25-metre pool; two lanes of the pool have a permanent depth of 2 metres and are separated from the remainder of the pool by a movable boom (wall).  The space on the other side of that wall has a full movable floor to allow for flexible use of the pool.  The smaller 20-metre pool also has a full movable floor.  The splash pool is located in its own hall and offers interactive water features including spray cannons, water jets, a slide and cascades.  Adults can take advantage of the luxury spa which allows them to journey through vitality and chill pools, sauna and steam rooms, sanarium, salt grotto and relaxation area.

The water treatment system incorporates PAC flocculation, medium rate filtration on single grade sand beds, enhanced water treatment via photo-oxidation using ultraviolet radiation, heating, pH control and residual disinfectant control using chlorine.  The project is a large complex project with 4 different pool areas providing an excellent facility to the community.

If you would like to learn more about what we can do for your next project, please visit our Services page.

  • Client:

    Ards & North Down Borough Council

  • Completion:

    2019

  • Project Manager:

    JCP Consulting

  • Architects:

    McAdam Design

  • Main Contractor:

    Heron Bros.

  • Structural Engineer:

    WYG

  • M&E Engineers:

    Michael Nugent Ltd.

  • Pool Consultant:

    Devin Consulting