Skip to content

Aberdeen Sports Village, Scotland

Share:
Aberdeen Sports Village Pool Hall

Project details

50m x 10 lane training and competition pool with a dividing boom to allow the pool to be split into two distinct areas. 25m diving pool with full area floating floor and dive air cushion system.

Project role

Design and specification of the pool water treatment and movable floor and boom; site monitoring of installation and commissioning.

At Aberdeen Sports Village, two independent water treatment plants are provided, one for each pool. Circulation within each pool takes account of the movable floor and the submersible boom, and the routing of all pipework is such that no pipework is buried underneath either of the 50m or diving pool tanks. The water treatment system incorporates PAC flocculation, medium rate filtration on single grade sand beds, photo-oxidation using ultraviolet, heating, pH control and residual disinfectant control using chlorine.

If you would like to learn more about what we can do for your next project, please visit our Services page.

  • Client:

    Aberdeen City Council

  • Completion:

    2014

  • Architects:

    FaulknerBrowns

  • Quantity Surveyor:

    Gleeds

  • M&E Engineers:

    Mott MacDonald

  • Pool Consultant:

    Devin Consulting

Project Gallery

Related Projects