Northampton School for Boys

Share:
Northampton School for Boys pool hall

Project details

25m x 13m, 6 lane, 2m deep competition swimming pool with 13m x 9m movable floor.

Project role

Design and specification of the pool water treatment and movable floor; site monitoring of installation and commissioning.

A new building on the Northampton School for Boys site providing the school with new gym fitness suite, events space, a dance studio, wet & dry changing facilities and a pool providing regional training and competition facilities with spectating gallery. Circulation within the pool takes account of the movable floor. The water treatment system incorporates PAC flocculation, medium rate filtration on sand, photo-oxidation using ultraviolet, heating, pH control and residual disinfectant control using on site chlorine generation. VSDs control pump flows linked to an electronic flow meter. Movable floor provides a range of water depths for different training activities.

If you would like to learn more about what we can do for your next project, please visit our Services page.

  • Client:

    Northampton School for Boys

  • Completion:

    2014

  • Architects:

    pHp Architects

  • Quantity Surveyor:

    Goodrich Consulting LLP

  • Structural Engineer:

    BCAL Consulting

  • M&E Engineers:

    Building Services Design

  • Pool Consultant:

    Devin Consulting

Project Gallery