At King’s College School, London the water treatment system incorporates PAC flocculation, medium rate filtration on single grade sand beds, heating, pH control and residual disinfectant control using chlorine.
Client:
King's College School, London
Completion:
2019
Project Manager:
Synergy
Architects:
David Morley Architects
Main Contractor:
Knight Harwood
Structural Engineer:
Price Myers
M&E Engineers:
Max Fordham
Pool Consultant:
Devin Consulting