Skip to content
Competition pool

Eastbourne College

Share:
Eastbourne College Exterior

Project details

25m pool.

Project role

Pool tank design advice, design and specification of the pool water treatment system, site monitoring of installation and commissioning works.

PWTAG compliant pool water treatment system serving an 8 lane 25m competition pool with raised ends to be used by Eastbourne College for swimming training, amateur swimming competitions and for external swimming clubs.  The water treatment system incorporates PAC flocculation, medium rate filtration on single grade sand beds, photo-oxidation using ultraviolet radiation, heating, pH control and residual disinfectant control using chlorine.

If you would like to learn more about what we can do for your next project, please visit our Services page.

  • Client:

    Eastbourne College

  • Completion:

    2018

  • Project Manager:

    Northgates Limited

  • Architects:

    Miller Bourne Architects

  • Quantity Surveyor:

    F T Allen

  • Structural Engineer:

    Gyoury Self Partnership

  • M&E Engineers:

    Hoare Lea

  • Pool Consultant:

    Devin Consulting

Project Gallery