Skip to content
State of the art academy

Premiership Football Academy

Share:
Premiership Football Academy Pool Hall

Project details

Nine specialist pools and three heat experiences are provided within a luxury wellness and spa setting, for sports rehabilitation, relaxation and training.

Project role

Design and specification of the pools, water treatment, movable floor and heat experiences; site monitoring of installation and commissioning.

The pools include a hydrotherapy pool with movable floor and massage stations, two cold plunge pools, two hot plunge pools, two Hydroworx pools with varying water depth treadmills, a hot spa pool and a training flow pool with counter current jets.

Seven water treatment systems are provided incorporating PAC flocculation, medium rate filtration on single grade sand beds, photo-oxidation using ultraviolet, heating, pH control and residual disinfectant control – to provide excellent, safe and hygienic pool water quality.

If you would like to learn more about what we can do for your next project, please visit our Services page.

  • Client:

    Confidential Premiership Football Academy

  • Completion:

    2016

  • Architects:

    Rafael Vinoly

  • Structural Engineers:

    Arup

  • Aquatic Consultants:

    Devin Consulting

  • M&E Engineers:

    Arup

Project Gallery