The pools include a hydrotherapy pool with movable floor and massage stations, two cold plunge pools, two hot plunge pools, two Hydroworx pools with varying water depth treadmills, a hot spa pool and a training flow pool with counter current jets.
Seven water treatment systems are provided incorporating PAC flocculation, medium rate filtration on single grade sand beds, photo-oxidation using ultraviolet, heating, pH control and residual disinfectant control – to provide excellent, safe and hygienic pool water quality.
Client:
Confidential Premiership Football Academy
Completion:
2016
Architects:
Rafael Vinoly
Structural Engineers:
Arup
Aquatic Consultants:
Devin Consulting
M&E Engineers:
Arup