Skip to content

CitySuites II Aparthotel, Manchester

Share:
CitySuites II Aparthotel Manchester Lap Pool

Project details

New build aparthotel in the upcoming Embankment West neighbourhood in Manchester. The building includes a communal spa with 18m x 5m lap pool and spa pool with water and air massage features. The spa also includes a poolside steam room.

Project role

Design and specification of the pool tanks, pool water treatment system, water features and heat experience cabin; site monitoring of installation and commissioning.

CitySuites II in Manchester has two independent water treatment plants, one for each pool. The water treatment system incorporates PAC flocculation, medium rate filtration on single grade sand beds, photo-oxidation using ultraviolet, heating, pH control and residual disinfectant control using chlorine.  The spa pool incorporates water and air massage features activated on demand by the bather.

If you would like to learn more about what we can do for your next project, please visit our Services page.

  • Clients:

    Select Property Group/Arcadis/Sir Robert McAlpine

  • Completion:

    2021

  • Project Manager:

    Arcadis

  • Architects:

    Callison RTKL-UK

  • Structural Engineer:

    Curtins

  • M&E Engineers:

    Ridge

  • Pool & Spa Consultant:

    Devin Consulting

Project Gallery