+44 (0)191 258 1653
 

Bulgari Hotel, Knightsbridge

Client:

Prime Development

Completion:

2012


Project Details:

25m x 7m x 1.3m deep lap pool and a 20m² vitality pool, both located on basement level 5.

Our Role:

Design and review of the water treatment and water feature systems; site monitoring of installation and commissioning.


Design Team

Architects:

Squire & Partners

Structural Engineer:

WSP Group

M & E Engineers:

AECOM

pool & spa consultant:

Devin

water quality fit for princes

Two independent water treatment plants are provided to serve the lap pool, and the hydrotherapy pool. Each water treatment plant has been designed to address the type and quantity of bather usage for each pool. The water treatment plants have been designed to provide a water quality that is ‘fit for princes’ and incorporates enhanced water treatment through the use of ultraviolet irradiation. A range of water features are provided in the hydrotherapy pool to include air loungers, body massage station, air seat and a water cascade.