+44 (0)191 258 1653
 

Splashpoint Worthing

Client:

Worthing Borough Council

Completion:

2013

Construction Costs:

£17.9M


Project Details:

25m x 13m x 6 lane competition pool and 13m x 12m diving/learner pool each with full area movable floor. Leisure waters, interactive features, flume and pirate ship; outdoor children’s play pool.

Our Role:

Design of water treatment systems & features, hydraulics & movable pool floor systems; specialist site monitoring of works.


Design Team

Architects:

Wilkinson Eyre

Quantity Surveyor:

Davis Langdon

Structural Engineer:

Aecom

M & E Engineers:

Aecom

pool consultant:

Devin

Further description

 

A copper clad architectural landmark and winner of World Architecture Award 2013 (sports category). Water treatment system design included innovative regenerative media filtration systems to reduce backwash water usage, with pool water heat recovery and reuse systems further contributing to a sustainable design solution.