+44 (0)191 258 1653
 

Huddersfield Sports Centre

Client:

Kirklees Council

Completion:

2015

Construction Cost:

£36M


Project Details:

A new sports centre with 25m competition pool, training pool with full movable floor, and leisure water attraction.

Our Role:

Design reviews of the water treatment and water feature systems; site monitoring of installation and commissioning.


Design Team

Project Manager:

BAM

Architects:

Aedas Architecture

Structural Engineer:

Arup

Aquatic Consultants:

Devin

M & E Engineers:

Arup

Pool consultant:

Devin


Further description

The leisure water attraction includes a 'sidewinder' feature which tips riders off the edge of a steep cliff into a giant U-shaped runway, flume ride, beach with floor bubble jets, squirting mushroom and spray hoop water features, lazy river with leaking pipes, tipping buckets, water curtain, hollow spray and spiral spray water features as part of the journey. There is also a bubble/spa pool, a play structure with slides, water cannons and tipping buckets, toddler pool with crab, turtle and palm tree slide water features.