Streatham Ice & Leisure Centre

Client:

Tesco

Completion:

2013

Construction Costs:

Budget £20M


Project Details:

A new leisure centre for Streatham replaces the existing ice rink with a new 60m x 30m pad, and two new pools below the ice rink; a 25m and a learner pool.

Our Role:

Devin provided the impartial expert advice on the pool water treatment for the two pools and on the ice engineering for the ice pad.


Design Team

Architects:

Michael Aukett Architects

Main Contractor:

Vinci Construction

Quantity Surveyor:

Gleeds

M & E Engineers:

Scott Wilson

pool & ice consultant:

Devin

Further description


The ice pad incorporates cooling pipes within a reinforced concrete permanent top slab; the header pipes are also contained within the slab, all laid on a vapour sealed insulator layer.  Three compressors provide cooling, with roof mounted adiabatic coolers for quietness and efficiency.

Heat recovery systems are utilised for the heater mat, the pre-heat of the resurface water, heating of pool water and the ice pit snow melting.